Project Title : Zalan Reservoir Dam (Clay Core Earthfill Dam)
|
|
Location : Iraq - Kurdistan - Sulaymaniyah |
Status : Under Construction - Dam |
Start Date : 2014 | End Date : 2024 |
Technical Specifications : Height of dam from foundation: 45 m Length of crest: 245 m Earth works: 750,000 m3 Reinforced concrete: 20,000 m3 Diversion system consists of two earth filled cofferdams (as parts of dam body) and diversion culvert Length of diversion culvert: 290 m Lateral spillway with ogee Ogee length: 40 m Cutoff wall: 3,600 m2 Water curtain and consolidation grouting: 8,700 ml |
Employer Ministry of Agriculture & Water Resources Engineer Ab-Niru Consulting Engineers Contract Prices 24,000,000,000 IQD Reservoir Volume 25,000,000 m3 Annual Water Discharge 70,000,000 m3
|
Description :
The Zalan Project is located at about 19.5 km north east of Sulaymaniyah city, and also at about 5 km south east of Sharbazher District. The reservoir stored water could be used to irrigate agricultural lands on the downstream of the dam and to produce of renewable hydropower energy. The project engineer is Ab-Niru Consulting Engineers that is the responsible partner for engineering works in the joint venture made of Ev-Yol and Ab-Niru. |
|