Project Title : Cheshmeh Ashegh Reservoir Dam (Roller Compacted Concrete)

Location : Iran - Fars
Status : Completed - Dam

Start Date :

Contract No.1 :      2009

Contract No.2 :      2014

End Date :

Contract No.1 :       2014

Contract No.2  :      2017

Technical Specifications :

Height of dam from foundation: 60 m

Length of crest: 360 m

Width of crest: 6 m

Excavation: 450,000 m3

Formworks: 40,000 m2

Concrete: 230,000 m3

Diversion system consists of two earth filled cofferdams and diversion tunnel.

Length of diversion tunnel: 105 m with 5m diameter

Spillway with ogee weir, flip bucket

Width of shoot: 36 m

Steel works: 900 ton

Employer

Fars Regional Water Authority

Engineer

Tehran-Sahab Consulting Engineers

Reservoir Volume

70,000,000 m3

Annual Water Discharge

53,000,000 m3

-------------------------------------

Updated Contract Price:

87,000,000 USD

 

 

Description L:

This project is located at the Cheshme Ashegh river in Shiraz 96 km far from Neyriz city and at the south side of the Vazire village. The aim of the project is to meet the need of the agricultural and industrial water of the region.

Unique experience

The 3 meter long concrete core got from the RCC dam body with no visible joints (30 cm layers).