Project Title : Cheshmeh Ashegh Reservoir Dam (Roller Compacted Concrete)
|
|
Location : Iran - Fars |
Status : Completed - Dam |
Start Date : Contract No.1 : 2009 Contract No.2 : 2014 |
End Date : Contract No.1 : 2014 Contract No.2 : 2017 |
Technical Specifications : Height of dam from foundation: 60 m Length of crest: 360 m Width of crest: 6 m Excavation: 450,000 m3 Formworks: 40,000 m2 Concrete: 230,000 m3 Diversion system consists of two earth filled cofferdams and diversion tunnel. Length of diversion tunnel: 105 m with 5m diameter Spillway with ogee weir, flip bucket Width of shoot: 36 m Steel works: 900 ton |
Employer Fars Regional Water Authority Engineer Tehran-Sahab Consulting Engineers Reservoir Volume 70,000,000 m3 Annual Water Discharge 53,000,000 m3 ------------------------------------- Updated Contract Price: 87,000,000 USD
|
Description L:
This project is located at the Cheshme Ashegh river in Shiraz 96 km far from Neyriz city and at the south side of the Vazire village. The aim of the project is to meet the need of the agricultural and industrial water of the region. Unique experience The 3 meter long concrete core got from the RCC dam body with no visible joints (30 cm layers). |
|