Project Title : Mianeh – Shahriar Dam Road (Lot 1)
|
|
Location : IRAN- EAST AZERBAIJAN |
Status : Under Construction - ROAD |
Start Date : 2021 | End Date : 2024 |
Technical Specifications : Length of project: 10.8 km 38 culverts in total 3 great bridges with total length of 60 m. 8 tunnels with total length of 2,215 m. Earth works: 1,750,000 m3 Tunnel excavation: 22,000 m3 Steel works: 850 ton Masonry: 7,500 m3 Formworks: 55,000 m2 Concrete: 30,000 m3 Sub base & Base: 72,000 m3 Asphalt: 36,500 ton
|
Employer East Azerbaijan Regional Water – Ministry of Energy Engineer Passillo Consulting Engineers Prices 18,000,000 USD
|
Description :
The route of this project is generally located in the mountainous areas near the city of Mianeh. The route of this section starts from about one kilometer west of Shahriar dam and passing the hard mountains overlooking the Ghezel Ozan River crosses the Mianeh-Khalkhal road at 8 + 947 km and then reaches the end of the section at 13 + 150 km. |
|