Project Title : Mashkid Sofla Dam (Roller Compacted Concrete) |
|
Location :IRAN- Sistan and Baluchestan |
Status : Under Construction - Dam |
Start Date : 2017 | End Date : 2024 |
Technical Specifications : Height of dam from foundation: 37.5 m Width of dam in foundation: 38 m Length of crest: 1457 m Crest width: 8 m Spillway type: Free overfall Length of spillway: 300 m Diversion system: Execution of up-stream coferdam and calvert with 5 intakes with dimensions of 4.5×4.5 meters with a stilling basin Excavation: 1,450,000 m3 Formworks: 185,000 m2 Steel works: 9,255 Ton CVC concrete: 185,000 m3 RCC concrete: 630,000 m3 Curtain and consolidation grouting: 350,000 m Soil-Cement: 165,000 m3 Sub-Base & Base: 191,200 m3 Asphalt: 30,000 m3 |
Employer Sistan and Baluchestan Regional Water – Ministry of Energy Engineer Ab Ara Sazeh Engineering Co. Contractor Evyol – Felar J. V.
|
Description : Water supply in deprived areas Mashkid Sofla dam project is located 55 km southeast of Saravan city in Sistan and Baluchestan province with the aim of exploiting surface water and supplying drinking water to Saravan city, agricultural development, preventing the risk of seasonal floods, etc. |
|