Project Title : Semirom-Yasuj Road (Lot 1) |
|
Location : Iran - Isfahan |
Status : Under Construction - Road |
Start Date : 2018 | End Date : 2023 |
Technical Specifications : Length of project: 32.3 km 2 bridges with total length of 225 m 2 tunnels with total length of 740 m 92 culverts in total Earth works: 4,100,000 m3 Tunnel Excavation: 60,000 m3 Pile Drilling: 800 ml Steel works: 1,530 ton Heavy steel works: 630 ton Masonry: 41,000 m3 Formworks: 80,000 m2 Concrete: 37,000 m3 Subgrade, Sub base & Base: 300,000 m3 Asphalt: 123,000 ton |
Employer
|
Description :
Lot 1 of Semirom-Yasuj road starts in 13-kilometer distance from Semirom city after the south ring road and continues about 32.3 kilometers after that. Due to the defile removal from the path in the existing route, the new road will be constructed in four lanes and most of the existing route will be eliminated from main route after that. |
|