Project Title : Ganjgah Sorkh Abad Road (Lots 2, 3, 4)
|
|
Location : Iran - Ardebil |
Status : Completed - Road |
Start Date :
Contract No.1 2004 Contract No.2 2011 |
End Date :
Contract No.1 2011 Contract No.2 2013 |
Technical Specifications : Total length of project: 20 km Totally 9 tunnels with total length of 3,160 m, the longest one is 1,060 m long) Totally 9 great bridges with total length of 636 m, the largest are Ghezelozan bridge with 8 spans each one 21 m long, and Mazra'e bridge with 5 spans each one 20 m long, and one single span steel bridge 36 m long. Totally 3 galleries with total length of 230 m Totally 60 culverts Retaining walls in concrete or masonry, totally more than 3,200 m Earth works: 5,500,000 m3 Steel works:6,500 ton Heavy steel works: 1,300 ton Formworks: 180,000 m2 Concrete: 240,000 m3 Masonry: 110,000 m3 Sub base: 40,000 m3 Base: 19,000 m3 Asphalt: 65,000 ton Access roads: 80 km |
Employer Ministry of Road and Transportation Engineer Passillo Consulting Engineers Total Updated Contract Prices 223,000,000 USD
|
Description :
This project located at 90 km south of Ardebil city, from Firozabad village of Khalkhal toward Sorkhabad. The project is in one of the most impossible districts of the country that passes through west part of Alborz Mountains. The necessity of 9 tunnels, 9 bridges and 3 galleries in this 20 km road indicates the difficulty of the work. For execution of the main road near to 80 km access road has been constructed. |
|