Project Title : Kurit Reservoir Dam (Concrete Gravitational -Arched Dam) |
|
Location : Iran - Yazd |
Status : Completed - Dam |
Start Date : 2001 | End Date : 2005 |
Technical Specifications : Dam body consists of concrete arched dam in the mid-part and gravity at abutments, related structures including intake, outlet and spillway. Height of dam from foundation: 53 m Length of crest: 345 m Excavation: 359,000 m3 Steel works: 492 ton Formworks: 36,000 m2 Concrete: 120,000 m3 Grouting curtain: 16,000 m Diversion system consists of earth filled cofferdam and diversion gallery Diversion channel: 4 m wide, 87 m long Access road length: 10 km |
Employer Yazd Regional Water Authority Engineer Ab- Pooy Consulting Engineers Updated Contract Price 37,200,000 USD Reservoir Volume 7,580,000 m3 Annual Water Discharge 10,300,000 m3
|
Description :
This dam located at 56 Km south-east of Tabas city near Chiruk village, over Kurit river and close to Kurit historical masonry arched dam. Main purposes of the project are seasonal flood protection, supplying irrigation and potable water to Tabas area and saving Kurit historical dam. |
|