Project Title : Birjand-Ghayen Highway (Lot 2)

Location : SRI LANKA-BANDARAWELA
Status : Completed - TUNNEL
Start Date : 2014 End Date : 2018
Technical Specifications :

Length of tunnel: 3,870 m          

Tunnel excavation: 90,000 m3

Portals Excavation: 140,000 m3

Stabilization consists shotcrete in 2 layers and wire mesh: 62,000 m2

Grouting: 300 ml

Steel works: 1,400 Ton

Formworks: 3,300 m2

Concrete: 11,500 m3

Employer
Farab Co.
Engineer
Amberg Engineering AG

Prices:

23,000,000 USD


 

Description :

The Uma Oya Multipurpose Development Project is located at the south eastern slope of the central highland of Sri Lanka. This project consists of a link tunnel between Dyraaba & Puhulpola dams, excavation and stabilization of two portals for intake headrace tunnel and adit headrace tunnel and execution of intake headrace structure.