Project Title : Khin-Arab Waste Water Treatment Plant - EPC
|
|
Location : Iran - Khorasan Razavi |
Status : Under Construction - Treatment Plant |
Start Date : 2010 | End Date : 2017 |
Technical Specifications : Excavation: 185,000 m3 Earth filling: 78,000 m3 Steel works: 3,200 ton Concrete: 30,000 m3 Formworks: 57,000 m2 Purchase, transportation and installation of waste water treatment equipment considering as 60% amount of contract |
Employer Mashhad Water and Waste Water Company Project Manager Tarh va Tosee Karavar & Kavosh Pay Mashad J.V. Engineer Pars Ab Tadbir Consulting Engineers Updated Contract Price 29,000,000 USD 14,500,000 €
|
Description :
Procurement of plant, design, supply, and installation of Khin-Arab (Mashhad) waste water treatment plant project containing: 1- Design and engineering of the civil, mechanical, electrical, control and instrumental works. 2- Supplying, providing, manufacturing, inspection. Testing in factory, transportation to project site, installation, pre commissioning, commissioning and trial operation of plant. 3- Operation, training program and any other related facilities stipulated on the contract. 4- Complete supplying, providing, transportation and construction of main sewer pipe line and 25 dependent manholes, appurtenance and equipment's by length of 2,110 meter with 1,800 mm diameter concrete pipe with internal PE cladding. In performance of waste water treatment plant in Khin-Arab, the methodology of ICEAS (Intermitting cycle extended aeration system), has been used for processing of an average of 83,000 m3/day, and maximum capacity of 7,200 m3/hr, for 430,000 population. This project is under contract of Omrab - Ev-Yol J.V. |
|