Project Title : AQRA Water Treatment Plant – EPC

Location : Iraq - Erbil
Status : Completed - Treatment Plant
Start Date : 2012 End Date : 2023
Technical Specifications :

Water treatment plant

Water intake structure

Water reservoirs

Electrical installations

Length of power transmission line and electrical installations including construction of power supply network 33 kv: 46 km

Control systems & instrumentation

Telecommunication system

Water network

-Pipe line with different diameter: 105,000 ml

Employer

Ministry of Municipality & Tourism

Contract Price

89,500,000,000 Iraqi Dinars


 

Description :

The work for this contract comprises the development of water supply system to feed AQRA area with potable water with a total design flow of 3,000 m3/hr through procurement of plant, design, supply, and installation of water treatment plant & 105 km pipeline & 46 km 33 kv O.H.Line.

The worksite is located at Duhok Governorate Aqra district and supply the following villages Bekhma, Sharafona, Steriya, Kasrook, Galook, Sofla, Zewa, Nerwa, Soriya, Galook Olya, Khara, Sosnawa, Kalat, Bijeel, Joona, Bashkal Rawand, Baskl Agha, Klavi and the intake located to near to Bekhma Village.

This project is under contract of Omrab-Ev-Yol - Hardam J.V.